PES Logo
Boston Chapter
TECHNICAL MEETING DETAILS
Plant Tour Planned
This will be a tour of a newly constructed National Grid Substation in Wakefield, MA.
Date: Wednesday Sep 2, 2009 From 5-7 PM
General Location: Wakefield, MA
Specific Location and Directions: 123 Montrose Ave, Wakefield, MA. Take I-95 (MA-128) to exit 42 South to Montrose Ave.
Equipment Installed:
Venue: Indoors and outdoors - dress for weather
Required Equipment: This is a construction site. Please bring hardhat, safety glasses, and high-visibility vest. Heavy-duty construction/hiking shoes or boots required and steel-toe greatly preferred. Standard office shoes, tennis shoes, etc. not allowed. A limited number of hardhats, safety glasses and vests may be available.
Max number of people: 20
Optional dinner afterwards at local restaurant.
Contact Administrator
Page Last Edited: 02/28/2010