SAS Gold organized a guided tour of
AltaLink’s 240kV Janet Substation in the SE of Calgary on
Sept 20, 2005.
The
substation hosts 240kV and 138kV voltages and supplies power
to Calgary.
The four
hour long guided tour gave visitors a chance to see
components of Alberta’s Interconnected Electric System (AIES)
in operation. Participants were introduced to high voltage
components and associated low voltage protection & control,
SCADA and teleprotection. The tour proved to be a fun
outdoor learning opportunity. |

Visiting AltaLink’s Janet Substation in the
SE of Calgary |