IEEE Power & Energy Society |
2008 pes General meeting July 20-24, 2008 |
Technical tours Meeting Registration is required plus the fee for the Tour |
A Power Quality Laboratory Tour—Eaton Corporation Experience the effects of harmonics and voltage disturbances such as over-voltages, sags, and surges demonstrated on Eaton’s Power Laboratory distribution system as well as actual application of technical solutions to improve power quality and reliability and increase energy efficiency.
Power Distribution Substation Tour—Duquesne Light Company See the renovation of Duquesne Light Company’s Highland and Arsenal Substations with new HV GIS & MV Metal-Clad Switchgear and the addition of underground high pressure 138 KV & 345 KV fluid filled transmission lines.
Power Generation & Electronics Tour—Westinghouse Nuclear & Compunetics Learn about Westinghouse Nuclear’s AP-1000 Next Generation Nuclear Power Plant and experience a demonstration of the AP-1000’s Simulator. Then learn how printed circuit boards are fabricated from copper, fiberglass, drilling, imaging, etc. at Compunetics.
Power Generation & Electronics Tour—Westinghouse Nuclear & Compunetix Learn about Westinghouse Nuclear’s AP-1000 Next Generation Nuclear Power Plant and experience a demonstration of the AP-1000’s Simulator. Then observe the hand and automated assembly of electronic assemblies—part placement, wave soldering, surface mounting, re-flow, cleaning, and testing at Compunetix.
Observe the manufacture of large power distribution transformers at Pennsylvania Transformer. Then, visit Touchstone Research Laboratory, Inc. to see how CFOAM can be used as electrodes in fuel cells, batteries, steel and aluminum melting, EMI shielding, as the ground in ships or other composite structures which are usually non-conductive, in lightning protection, and as heating elements in space heaters. |
Please check back often as this page is a work in progress. |
Click Here PES-2008 Technical Tour Schedule
|
Monday |
Tuesday |
|
Wednesday |
|
|
|
|
|
|
|
7:30 AM |
|
|
|
|
|
8:00 AM |
|
|
|
|
|
|
|
Power Distribution Substation |
Power Transformer |
Power Distribution Substation |
Power Transformer |
Noon |
|
|
(Lunch Provided) |
|
(Lunch Provided) |
12:30 PM |
|
|
|
|
|
1:00 PM |
|
|
|
|
|
|
|
|
|
|
|
PM |
Power Quality |
Nuclear Power Generation & Electronics |
|
Nuclear Power Generation & Electronics |
Power Quality |
5:00 PM |
|
|
|
|
|