Switchgear Committee Fall (October 8-13, 2023, San Diego)
and minutes of Virtual Meetings between 4/21/23 and 10/8/23
Download the Final Schedule of the Fall 2023 Meeting
Main Committee
Description | Meeting Location | Document |
---|---|---|
Minutes of Main Switchgear Committee Conference with Attendance | San Diego, CA | F23_MC_Minutes_R00.pdf |
ANSI ASC C37 Liason Report | San Diego, CA | F23_MC_ASC-C37_Report_R00.pdf |
STLNA Liason Report | San Diego, CA | F23_MC_STLNA_Report_R00.pdf |
Registrar's Report | San Diego, CA | F23_MC_Registrar_Report_R0.pdf |
Standards Coordinator Report | San Diego, CA | F23_MC_StdCoord_Rpt_R01.pdf |
ERP Awards & In Memorium Recognition Slides | San Diego, CA | F23_MC_ERP+Memorium_Slides_Rev00.pdf |
Main Committee - Oversight Revision Meeting (Virtual 1) | Virtual 2023-08-28 | F23_MC_Minutes_V1_R00.pdf |
Administrative Subcommittee (AdsCom)
Description | Meeting Location | Document |
---|---|---|
Minutes of ADSCOM Meeting with Attendance | San Diego, CA | F23_ADSCOM_Minutes_R01.pdf |
Minutes of C37.100.1 WG Meeting | San Diego, CA | F23_ADSCOM_C37.100.1_WG_Minutes_R03.pdf |
Minutes of C37.100.2 WG (Virtual Meeting) | Virtual 2023-09-12 | F23_ADSCOM_C37.100.2_WG_Virt1_Minutes_R00.pdf |
Minutes of C37.100.2 WG Meeting | San Diego, CA | F23_ADSCOM_C37.100.2_WG_Minutes_R00.pdf |
Minutes of C37.100.6 WG Meeting | San Diego, CA | F23_ADSCOM_C37.100.6_WG_Minutes_R00.pdf |
Minutes of C37.100.8 WG Meeting | San Diego, CA | F23_ADSCOM_C37.100.8_WG_Minutes_R03.pdf |
Minutes of C37.100.8 WG (Virtual Meeting 1) | Virtual 2023-06-06 | F23_ADSCOM_C37.100.8_WG_V1_2023-06-06_Minutes_R00.pdf |
Minutes of C37.100.8 WG (Virtual Meeting 2) | Virtual 2023-08-31 | F23_ADSCOM_C37.100.8_WG_V2_2023-08-31_Minutes_R02.pdf |
Minutes of C37.86 WG Meeting | San Diego, CA | F23_ADSCOM_C37.86_WG_Minutes_R02.pdf |
Minutes of C37.86 WG (Virtual Meeting) | Virtual 2023-09-15 | F23_ADSCOM_C37.86_WG_V1_Minutes_R03.pdf |
High Voltage Circuit Breakers Subcommittee (HVCB)
Description | Meeting Location | Document |
---|---|---|
Minutes of HVCB meeting | San Diego, CA | F23_HVCB_SC_Minutes_REV00.pdf |
Minutes of PC37.01 working group meeting | San Diego, CA | F23_HVCB_WG_PC37.01_REV00.pdf |
Minutes of PC37.04a working group meeting | San Diego, CA | F23_HVCB_WG_PC37.04a_REV00.pdf |
Minutes of PC37.09a working group meeting | San Diego, CA | F23_HVCB_WG_PC37.09a_REV00.pdf |
Minutes of PC37.010 working group meeting | San Diego, CA | F23_HVCB_WG_PC37.010_REV00.pdf |
Minutes of C37.015 PAR study group meeting | San Diego, CA | F23_HVCB_SG_C37.015_REV00.pdf |
Minutes of PC37.016 working group meeting | San Diego, CA | F23_HVCB_WG_PC37.016_REV00.pdf |
Minutes of PC37.10 working group meeting | San Diego, CA | F23_HVCB_WG_PC37.10_REV00.pdf |
Minutes of C37.12 PAR study group meeting | San Diego, CA | |
Minutes of C37.12.1 PAR study group (No Meeting) | San Diego, CA |
High Voltage Fuses Subcommittee (HVF)
Description | Meeting Location | Document |
---|---|---|
Minutes of HVF Sub-committee | San Diego, CA | F23_HVF_SC_Minutes_Rev1.pdf |
Minutes PC37.41 – High Voltage Fuse Design Tests and Specifications | San Diego, CA | F23_HVF_C37.41_WG_Minutes_Rev2.pdf |
High Voltage Switches Subcommittee (HVS)
Description | Meeting Location | Document |
---|---|---|
Minutes of All Subcommittee Meetings with Attendance | San Diego, CA | F23_HVS_SC_Minutes_R00.pdf |
Minutes of C37.30.2 - Study Group for Revision PAR for C37.30.2 -2015 Guide for Wind-Loading Evaluation of HV Switches | San Diego, CA | F23_HVS_SG_PC37.30.2_Minutes_Rev00.pdf |
Minutes of C37.30.3 and C37.30.4 - Requirements for and Test Code for HV Interrupter Switches | San Diego, CA | F23_HVS_SG_PC37.30.3+PC37.30.4_Minutes_Rev00.pdf |
Minutes of C37.30.7 - Requirements for High Voltage Air Switches Above 1000 Vdc | San Diego, CA | F23_HVS_WG_PC37.30.7_Minutes_Rev00.pdf |
Low-Voltage Switchgear Devices Subcommittee (LVSD)
Description | Meeting Location | Document |
---|---|---|
Minutes of LVSD Subcommittee Meeting | San Diego, CA | F23_LVSD_SC_Minutes_R01.pdf |
C37.17 Working Group Minutes | San Diego, CA | F23_LVSD_C37.17_WG_Minutes_R01.pdf |
C37.13 Working Group Meeting Minutes | San Diego, CA | F23_LVSD_C37.13_Minutes_R02.pdf |
C37.13.1 Working Group Meeting Minutes | San Diego, CA | F23_LVSD_C37.13.1_WG_Minutes_R00.pdf |
C37.14 Working Group Meeting Minutes | Virtual 2023-09-15 | F23_LVSD_C37.14_WG_V1_Minutes_R01.pdf |
C37.14 Working Group Meeting Minutes | San Diego, CA | F23_LVSD_C37.14_WG_Minutes_R00.pdf |
C37.27 Working Group Minutes | San Diego, CA | Coming Soon |
Reclosers and Other Disdribution Equipment Subcommittee (RODE)
Description | Meeting Location | Document |
---|---|---|
Minutes of RODE Subcommittee Meeting | San Diego, CA (10/13/2023) | F23_RODE_SC_Minutes_2023-10-13_R00.pdf |
Minutes PC37.63 – Sectionalizers | San Diego, CA (10/9/2023) | F23_RODE_C37.63_WG_Minutes_2023-10-09_R00.pdf |
Minutes PC37.63 – Sectionalizers | Virtual (9/15/2023) | F23_RODE_C37.63_WG_OL_Minutes_2023-10-15_R0.pdf |
Minutes PC37.63 – Sectionalizers | Virtual (5/24/2023) | F23_RODE_C37.63_WG_OL_2023-05-24_R0.pdf |
Minutes PC37.74 – Subsurface, Vault, and Padmounted Switchgear | San Diego, CA (10/12/2023) | F23_RODE_C37.74_WG_Minutes_2023-10-12_R2.pdf |
Minutes RODE C37.60 / 62271-111 Reclosers DLMT | San Diego , CA (10/10/2023) | F23_RODE_C37.60_DLMT_2023-10-10_Minutes_R2_With-Presentations.pdf |
Minutes RODE C37.60 / 62271-111 Reclosers DLMT | Virtual (7-10-2023) | F23_RODE_C37.60_DLMT_OL_2023-07-10_Minutes_R0.pdf |
Standards Status Report for RODE | F23_RODE_SC_StdRpt_R00.pdf |
Switchgear Assemblies Subcommittee (SA)
Description | Meeting Location | Document |
---|---|---|
Minutes of SA Subcommittee Meeting with Attendance | San Diego, CA | F23_SA_SC_Minutes_R00.pdf |
Document Status Report – 2023-11-14 | San Diego, CA | F23_SA_SC_StdRep_R00.pdf |
Minutes of C37.20.1 – Standard for Metal-Enclosed Low-Voltage (1000 Vac and below, 3200 Vdc and below) Power Circuit Breaker Switchgear | San Diego, CA | F23_SA_C37.20.1_WG_Minutes_R01.pdf |
Minutes of C37.20.4 – Standard for Indoor AC Switches (1 kV-52 kV) for Use in Metal-Enclosed Switchgear | San Diego, CA | F23_SA_C37.20.4_WG_Minutes_R01.pdf |
Minutes of C37.20.6 – Standard for 4.76 kV to 48.3 kV Rated Ground and Test Devices Used in Enclosures | San Diego, CA | F23_SA_C37.20.6_WG_Minutes_R01.pdf |
Minutes of C37.20.7 – Recommended Practice for Testing Switchgear Rated Up to 52 kV for Internal Arcing Faults | San Diego, CA | F23_SA_C37.20.7_WG_Minutes_R01.pdf |
Minutes of C37.20.7.X – Guide for Application, Installation, and Use of Switchgear Rated Up to 52 kV Tested for Internal Arc Faults | San Diego, CA | F23_SA_C37.20.7.X_SG_Minutes_R02.pdf |
Minutes of C37.20.9a –Standard for Metal-Enclosed Switchgear Rated 1 kV to 52 kV Incorporating Gas Insulating Systems | San Diego, CA | F23_SA_C37.20.9a_WG_Minutes_R02.pdf |
Minutes of C37.20.10 – Standard for Definitions for AC (52 kV and Below) and DC (3.2 kV and Below) Switchgear Assemblies | San Diego, CA | F23_SA_C37.20.10_WG_Minutes_R01.pdf |
Minutes of C37.21 –Standard for Control Switchboards | San Diego, CA | F23_SA_C37.21_WG_Minutes_R01.pdf |
Minutes of C37.23 – Standard for Metal-Enclosed Bus | San Diego, CA | F23_SA_C37.23_WG_Minutes_R01.pdf |
Minutes of C37.24 – Guide for Evaluating the Effect of Solar Radiation on Outdoor Metal-Enclosed Switchgear | San Diego, CA | F23_SA_C37.24_WG_Minutes_R00.pdf |
Minutes of C37.81 – Guide for Seismic Qualification of Class 1E Metal-Enclosed Power Switchgear Assemblies | San Diego, CA | F23_SA_C37.81_WG_Minutes_R01.pdf |
Minutes of C37.82 – Standard for the Qualification of Switchgear Assemblies for Class 1E Applications in Nuclear Power Generating Stations | San Diego, CA | F23_SA_C37.82_WG_Minutes_R01.pdf |
Technology and Innovation Subcommittee (TI)
Description | Meeting Location | Document |
---|---|---|
Minutes of T&I Meeting with Attendance and all attachments | Clearwater | F23_TI_SC_Minutes_R00.pdf |
Education, Recognition, and Publications Subcommittee (ER&P)
Updated: February 9, 2024