Corner

Switchgear Fall 2023 Meeting Minutes
Including Virtual Meetings


Switchgear Committee Fall (October 8-13, 2023, San Diego)
and minutes of Virtual Meetings between 4/21/23 and 10/8/23



Download the Final Schedule of the Fall 2023 Meeting


Main Committee

DescriptionMeeting LocationDocument
Minutes of Main Switchgear Committee Conference with AttendanceSan Diego, CAF23_MC_Minutes_R00.pdf 
ANSI ASC C37 Liason ReportSan Diego, CAF23_MC_ASC-C37_Report_R00.pdf 
STLNA Liason ReportSan Diego, CAF23_MC_STLNA_Report_R00.pdf 
Registrar's ReportSan Diego, CAF23_MC_Registrar_Report_R0.pdf 
Standards Coordinator ReportSan Diego, CAF23_MC_StdCoord_Rpt_R01.pdf 
ERP Awards & In Memorium Recognition SlidesSan Diego, CAF23_MC_ERP+Memorium_Slides_Rev00.pdf 
Main Committee - Oversight Revision Meeting (Virtual 1)Virtual
2023-08-28
F23_MC_Minutes_V1_R00.pdf 


Administrative Subcommittee (AdsCom)

DescriptionMeeting LocationDocument
Minutes of ADSCOM Meeting with AttendanceSan Diego, CAF23_ADSCOM_Minutes_R01.pdf 
Minutes of C37.100.1 WG MeetingSan Diego, CAF23_ADSCOM_C37.100.1_WG_Minutes_R03.pdf 
Minutes of C37.100.2 WG (Virtual Meeting)Virtual
2023-09-12
F23_ADSCOM_C37.100.2_WG_Virt1_Minutes_R00.pdf 
Minutes of C37.100.2 WG MeetingSan Diego, CAF23_ADSCOM_C37.100.2_WG_Minutes_R00.pdf 
Minutes of C37.100.6 WG MeetingSan Diego, CAF23_ADSCOM_C37.100.6_WG_Minutes_R00.pdf 
Minutes of C37.100.8 WG MeetingSan Diego, CAF23_ADSCOM_C37.100.8_WG_Minutes_R03.pdf 
Minutes of C37.100.8 WG (Virtual Meeting 1)Virtual
2023-06-06
F23_ADSCOM_C37.100.8_WG_V1_2023-06-06_Minutes_R00.pdf 
Minutes of C37.100.8 WG (Virtual Meeting 2)Virtual
2023-08-31
F23_ADSCOM_C37.100.8_WG_V2_2023-08-31_Minutes_R02.pdf 
Minutes of C37.86 WG MeetingSan Diego, CAF23_ADSCOM_C37.86_WG_Minutes_R02.pdf 
Minutes of C37.86 WG (Virtual Meeting)Virtual
2023-09-15
F23_ADSCOM_C37.86_WG_V1_Minutes_R03.pdf 


High Voltage Circuit Breakers Subcommittee (HVCB)

DescriptionMeeting LocationDocument
Minutes of HVCB meetingSan Diego, CAF23_HVCB_SC_Minutes_REV00.pdf 
Minutes of PC37.01 working group meetingSan Diego, CAF23_HVCB_WG_PC37.01_REV00.pdf 
Minutes of PC37.04a working group meetingSan Diego, CAF23_HVCB_WG_PC37.04a_REV00.pdf 
Minutes of PC37.09a working group meetingSan Diego, CAF23_HVCB_WG_PC37.09a_REV00.pdf 
Minutes of PC37.010 working group meetingSan Diego, CAF23_HVCB_WG_PC37.010_REV00.pdf 
Minutes of C37.015 PAR study group meetingSan Diego, CAF23_HVCB_SG_C37.015_REV00.pdf 
Minutes of PC37.016 working group meetingSan Diego, CAF23_HVCB_WG_PC37.016_REV00.pdf 
Minutes of PC37.10 working group meetingSan Diego, CAF23_HVCB_WG_PC37.10_REV00.pdf 
Minutes of C37.12 PAR study group meetingSan Diego, CA 
Minutes of C37.12.1 PAR study group (No Meeting)San Diego, CA 


High Voltage Fuses Subcommittee (HVF)

DescriptionMeeting LocationDocument
Minutes of HVF Sub-committeeSan Diego, CAF23_HVF_SC_Minutes_Rev1.pdf 
Minutes PC37.41 – High Voltage Fuse Design Tests and SpecificationsSan Diego, CAF23_HVF_C37.41_WG_Minutes_Rev2.pdf 


High Voltage Switches Subcommittee (HVS)

DescriptionMeeting LocationDocument
Minutes of All Subcommittee Meetings with AttendanceSan Diego, CAF23_HVS_SC_Minutes_R00.pdf 
Minutes of C37.30.2 - Study Group for Revision PAR for C37.30.2 -2015 Guide for Wind-Loading Evaluation of HV SwitchesSan Diego, CAF23_HVS_SG_PC37.30.2_Minutes_Rev00.pdf 
Minutes of C37.30.3 and C37.30.4 - Requirements for and Test Code for HV Interrupter SwitchesSan Diego, CAF23_HVS_SG_PC37.30.3+PC37.30.4_Minutes_Rev00.pdf 
Minutes of C37.30.7 - Requirements for High Voltage Air Switches Above 1000 VdcSan Diego, CAF23_HVS_WG_PC37.30.7_Minutes_Rev00.pdf 


Low-Voltage Switchgear Devices Subcommittee (LVSD)

DescriptionMeeting LocationDocument
Minutes of LVSD Subcommittee MeetingSan Diego, CAF23_LVSD_SC_Minutes_R01.pdf 
C37.17 Working Group MinutesSan Diego, CAF23_LVSD_C37.17_WG_Minutes_R01.pdf 
C37.13 Working Group Meeting MinutesSan Diego, CAF23_LVSD_C37.13_Minutes_R02.pdf 
C37.13.1 Working Group Meeting MinutesSan Diego, CAF23_LVSD_C37.13.1_WG_Minutes_R00.pdf 
C37.14 Working Group Meeting MinutesVirtual
2023-09-15
F23_LVSD_C37.14_WG_V1_Minutes_R01.pdf 
C37.14 Working Group Meeting MinutesSan Diego, CAF23_LVSD_C37.14_WG_Minutes_R00.pdf 
C37.27 Working Group MinutesSan Diego, CAComing Soon 


Reclosers and Other Disdribution Equipment Subcommittee (RODE)

DescriptionMeeting LocationDocument
Minutes of RODE Subcommittee MeetingSan Diego, CA (10/13/2023)F23_RODE_SC_Minutes_2023-10-13_R00.pdf 
Minutes PC37.63 – SectionalizersSan Diego, CA (10/9/2023)F23_RODE_C37.63_WG_Minutes_2023-10-09_R00.pdf 
Minutes PC37.63 – SectionalizersVirtual (9/15/2023)F23_RODE_C37.63_WG_OL_Minutes_2023-10-15_R0.pdf 
Minutes PC37.63 – SectionalizersVirtual (5/24/2023)F23_RODE_C37.63_WG_OL_2023-05-24_R0.pdf 
Minutes PC37.74 – Subsurface, Vault, and Padmounted SwitchgearSan Diego, CA (10/12/2023)F23_RODE_C37.74_WG_Minutes_2023-10-12_R2.pdf 
Minutes RODE C37.60 / 62271-111 Reclosers DLMTSan Diego , CA (10/10/2023)F23_RODE_C37.60_DLMT_2023-10-10_Minutes_R2_With-Presentations.pdf 
Minutes RODE C37.60 / 62271-111 Reclosers DLMTVirtual (7-10-2023)F23_RODE_C37.60_DLMT_OL_2023-07-10_Minutes_R0.pdf 
Standards Status Report for RODE F23_RODE_SC_StdRpt_R00.pdf 


Switchgear Assemblies Subcommittee (SA)

DescriptionMeeting LocationDocument
Minutes of SA Subcommittee Meeting with AttendanceSan Diego, CAF23_SA_SC_Minutes_R00.pdf 
Document Status Report – 2023-11-14San Diego, CAF23_SA_SC_StdRep_R00.pdf 
Minutes of C37.20.1 – Standard for Metal-Enclosed Low-Voltage (1000 Vac and below, 3200 Vdc and below) Power Circuit Breaker SwitchgearSan Diego, CAF23_SA_C37.20.1_WG_Minutes_R01.pdf 
Minutes of C37.20.4 – Standard for Indoor AC Switches (1 kV-52 kV) for Use in Metal-Enclosed SwitchgearSan Diego, CAF23_SA_C37.20.4_WG_Minutes_R01.pdf 
Minutes of C37.20.6 – Standard for 4.76 kV to 48.3 kV Rated Ground and Test Devices Used in EnclosuresSan Diego, CAF23_SA_C37.20.6_WG_Minutes_R01.pdf 
Minutes of C37.20.7 – Recommended Practice for Testing Switchgear Rated Up to 52 kV for Internal Arcing FaultsSan Diego, CAF23_SA_C37.20.7_WG_Minutes_R01.pdf 
Minutes of C37.20.7.X – Guide for Application, Installation, and Use of Switchgear Rated Up to 52 kV Tested for Internal Arc FaultsSan Diego, CAF23_SA_C37.20.7.X_SG_Minutes_R02.pdf 
Minutes of C37.20.9a –Standard for Metal-Enclosed Switchgear Rated 1 kV to 52 kV Incorporating Gas Insulating SystemsSan Diego, CAF23_SA_C37.20.9a_WG_Minutes_R02.pdf 
Minutes of C37.20.10 – Standard for Definitions for AC (52 kV and Below) and DC (3.2 kV and Below) Switchgear AssembliesSan Diego, CAF23_SA_C37.20.10_WG_Minutes_R01.pdf 
Minutes of C37.21 –Standard for Control SwitchboardsSan Diego, CAF23_SA_C37.21_WG_Minutes_R01.pdf 
Minutes of C37.23 – Standard for Metal-Enclosed BusSan Diego, CAF23_SA_C37.23_WG_Minutes_R01.pdf 
Minutes of C37.24 – Guide for Evaluating the Effect of Solar Radiation on Outdoor Metal-Enclosed SwitchgearSan Diego, CAF23_SA_C37.24_WG_Minutes_R00.pdf 
Minutes of C37.81 – Guide for Seismic Qualification of Class 1E Metal-Enclosed Power Switchgear AssembliesSan Diego, CAF23_SA_C37.81_WG_Minutes_R01.pdf 
Minutes of C37.82 – Standard for the Qualification of Switchgear Assemblies for Class 1E Applications in Nuclear Power Generating StationsSan Diego, CAF23_SA_C37.82_WG_Minutes_R01.pdf 


Technology and Innovation Subcommittee (TI)

DescriptionMeeting LocationDocument
Minutes of T&I Meeting with Attendance and all attachmentsClearwaterF23_TI_SC_Minutes_R00.pdf 


Education, Recognition, and Publications Subcommittee (ER&P)

Reported under the Main Committee


Updated: February 9, 2024